Contact Us
-
Hengtai Road,daqiuzhuang town,Jinghai county, Tianjin, China
-
+8615122229899


Steel Plank
Standard:AS/NZS 1576/1577/3610 Grade:Q195/Q235/Q345 Size:210X45,225X38,230X60,240X45,250X50,330X50,500X50,etc
Description
1.Scaffolding Steel Plank Specification
——————————————————————————————————————
Item | Description | Scaffolding Steel Plank |
1 | Standard: | AS/NZS 1576/1577/3610 |
2 | Grade: | Q195/Q235/Q345 |
3 | Size: | 210X45,225X38,230X60,240X45,250X50,330X50,500X50,etc |
4 | Thickness: | 1.0-2.0mm |
5 | Length: | 1/1.5/1.8/2/2.4/2.5/3/3.5/4m with hooks or without hooks |
6 | Tolerance: | Acc to the standard or zero tolerance or acc to your requests |
7 | Support: | Common/Box/Ladder support |
8 | Surface: | Pre-galvanized,Hot dipped galvanised |
9 | Package: | 100pcs/bundle or as request |
10 | Test& Certificate: | SGS/ISO/BV/EN/CE/CQC/CCIC |
11 | Delivery time: | Stock loaded within 5 days, customized order 8-19days |
12 | Shipment terms: | By 20/40FT containers or by bulk vessels as per condition |
13 | Payment terms: | T/T,LC,etc |
14 | Test: | 1.Chemical Composition Analysis,C,Si,Mn,P,S 2.Uniformly distributed load capacity inspection 3.Walking Load Limit 4.Concentrated load on area capacity inspection |
15 | Application: | 1.Steel plank is used to walk through the scaffolding system or elevate the step on the scaffolding. 4. Slab Support, Staircase, Stage Plateforms, Bridge Support, Mobile Tower, etc. |

2.How to Produce Scaffolding Steel Plank ?
——————————————————————————————————————
3.Scaffolding Steel Plank Size Table
——————————————————————————————————————
Width*Height | Thickness | Length | Main market |
210*45MM | 1.0-2.0MM | 1-4M | South east Asia |
240*45MM | 1.0-2.0MM | 1-4M | |
250*50MM | 1.0-2.0MM | 1-4M | |
250*40MM | 1.0-2.0MM | 1-4M | |
225*38MM | 1.0-2.0MM | 1-4M | The Middle East |
230*65MM | 1.5-1.8MM | 1-4M | Australia |
300*50MM | 1.5-1.8MM | 1-4M | The Europe |
We also can produce different size of plank according to your requirement. |
4.Scaffolding Steel Plank Loading from Tianjin Port,China
——————————————————————————————————————
5.Scaffolding Steel Plank FAQ
——————————————————————————————————————
FAQ: | |
Q1: What is your loading port? | |
A: Xingang port, China | |
Q2: Can I have a sample before orders? is it free or extra ? | |
A: Yes, Small samples in store and can provide the samples for free. Catalog is available, most patterns we have ready | |
Q3: What does your company do regarding the quality control? | |
A: BV and SGS certificates, production process followed the ISO 9000 system. | |
Q4: May I have a trail order ? | |
A: Of course, we are glad to make a trail order to show our quality and service. | |
Q5: How long will I get the goods? | |
Asia Countries: 10-30 days | |
Europe Countries:30-50days | |
Middle East: Around 30-40 days | |
Africa: Around:40-60 days | |
North America: 30-60days | |
South America: 30-60 days |
6.Scaffolding Steel Plank Certification
——————————————————————————————————————
Hot Tags: steel plank, China, suppliers, factory, buy, price, pricelist, X52 Ssaw Pipe, Bs1139 Swivel Coupler, Prestressed Concrete Steel Strand, Adjustable Prop With Plate Head, Board Retaining Coupler, Oiled Square Tube
You Might Also Like